Much time was spent trying to figure out tile.
lines drawn on the bathroom wall to try to figure out tile placement
Charlene did demolition
the wall, opened up, revealed that the old window was much much larger
old tub out, sucker was heavy
amusing construction details were found, like the fact that someone missed a stud, and kept nailing for the entire row
insulation was installed
and this morning, two guys arrived with the tub, we carefully tilted it off the back of the truck on to cribbing, carried it into the house, slid it into place, lifted and cribbed it into the right spot, now to cut the drain hole a little larger, apply FortiFlash around the edges and mortar underneath, and lower the whole thing into place.